EV CHARGER INSTALL

CLIENT

York Council

CATEGORY

EV Charger Install

LOCATION

York

DATE

October 9th 2025

CLIENT

York Council

LOCATION

York

CATEGORY

EV Charger Install

DATE

October 9th 2025

CAR PARK EV CHARGER INSTALL

PROJECT DETAIL

In response to the increasing demand for reliable and accessible electric vehicle (EV) charging infrastructure, our team was appointed to deliver a comprehensive EV charging installation at the Central Car Park in York. This project formed part of a wider initiative by the local council and City Centre Parking Ltd to encourage cleaner transportation options and reduce the city’s overall carbon footprint.

The car park, located in a high traffic urban area, serves hundreds of commuters, residents, and visitors daily. The client’s goal was to future proof the site by integrating smart charging technology capable of supporting both current and anticipated EV adoption levels over the next decade. Our role was to design and implement a robust, scalable, and easy to use charging network that would provide convenience for drivers while minimizing operational disruption to the car park’s day to day activities.

From the initial feasibility studies to the final commissioning, our team managed every phase of the project. Detailed site surveys and electrical load assessments guided the design of a solution that balanced performance, energy efficiency, and safety. The installation included twelve dual-socket 22kw AC chargers, allowing up to twenty-four vehicles to charge simultaneously, supported by intelligent load management software to optimize energy distribution.

Throughout the six-week project, careful coordination with the client, local authorities, and the Distribution Network Operator (DNO) ensured compliance with all technical and safety regulations. The final installation delivers a dependable, user-friendly EV charging experience, positioning the car park as a key charging destination in the city centre and contributing to a more sustainable urban transport network.

SCOPE OF WORK

Site survey and power assessment to determine load capacity and optimal charger placement

Installation of 12 dual-socket 22kW AC chargers, providing charging for up to 24 vehicles simultaneously

Trenching and cabling works to connect chargers to the main distribution board

Integration with back-office management system for monitoring, billing, and user access control

Protective bollards and signage to ensure safety and user clarity

Testing, commissioning, and DNO approval

KEY FEATURES

Smart Charging Management: Real-time monitoring and dynamic load balancing for efficient energy use

User-Friendly Access: RFID cards and mobile app integration for easy operation and payments

Sustainable Design: Energy-efficient components and low-impact materials

Future-Proof Infrastructure: Designed to support additional chargers as EV demand continues to grow

PROJECT

THE OUTCOME

The completed installation provides a reliable and efficient EV charging hub that supports up to 24 vehicles simultaneously. The system achieves over 99.5% uptime and has been praised by both users and management for its simplicity and reliability. This project represents a significant step toward the city’s sustainability goals and demonstrates the scalability of modern EV infrastructure in urban environments.

Interested in a Similar Project?

We provide turnkey EV charging solutions for car parks, workplaces, and commercial properties — from feasibility studies and design through to installation and maintenance.